Review of Brave New War by John Robb (Continued).
Large electrical grids and other networks are vulnerable due to the large transmission distances involved. One cannot guard every power or gas line. As a result, as prevention against disruption, power will need to be generated locally, presumably primarily through renewable such as solar (which will become cost competitive within the decade) and wind power (which is competitive now). The national network is too vulnerable, which will provide incentive to localize power generation. The question remains whether or not this development may be forced.
What is Maximum Advantage?
Wednesday, September 12, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment